Floor Ground Coating Spray Polyurea Spua Impact Resistance Coating

Product Details
Customization: Available
CAS No.: Polyurea
Formula: R-Nh-Co-CH-R`
Still deciding? Get samples of US$ 5/kg
Request Sample
Manufacturer/Factory, Trading Company
Diamond Member Since 2021

Suppliers with verified business licenses

Management System Certification
ISO 9001
  • Floor Ground Coating Spray Polyurea Spua Impact Resistance Coating
  • Floor Ground Coating Spray Polyurea Spua Impact Resistance Coating
  • Floor Ground Coating Spray Polyurea Spua Impact Resistance Coating
  • Floor Ground Coating Spray Polyurea Spua Impact Resistance Coating
  • Floor Ground Coating Spray Polyurea Spua Impact Resistance Coating
  • Floor Ground Coating Spray Polyurea Spua Impact Resistance Coating
Find Similar Products

Basic Info.

EINECS
Polyurea
Color
Component a: Transparent/Light Yellow B Customized
Appearance
Liquid
Main Raw Material
Polyurethane
Method
Spray
Level
Finish Coat
Drying Method
Chemical Merchanism Drying
Certification
ISO14001, ISO9001
Substrate
No Limit
Components
Film Forming Matter
Formation Mechanism
Conversion Type
Transport Package
Pallet
Specification
Component A: 220KG/bucket Component B: 210KG/bucke
Trademark
0
Origin
China
HS Code
3911900003
Production Capacity
8000t/Year

Product Description

Spray Polyurea Coating Prices Anticorrosion Polyurea Waterproofing
Spray Polyurea Elastomer Coating SPUA for
Anticorrosion and waterproof protection of construction, chemicals, transportation,
metallurgy, electric power, aerospace, marine, shipbuilding, and other fields.

Construction and Project caseFloor Ground Coating Spray Polyurea Spua Impact Resistance Coating

Spray Polyurea Coating Prices Anticorrosion Polyurea Waterproofing

The versatility of spray polyurea elastomer products 
Product shelf life and storage:
1. The storage temperature should be 5-40ºC
2. Under normal storage and transportation conditions, the storage period is not less than 6 months from the date of production
3. Store in a cool, ventilated environment, avoid direct sunlight, prohibit close to fire sources, and prevent collisions
4. Packaging: component A: 220KG/drum, component B: 210KG/drum
 
Precautions:
1. During construction, the temperature of the substrate must be 3°C higher than the dew point temperature;
2. Before the product is used, component B should be fully stirred;
3. The system has 100% solid content, and it is strictly forbidden to add any diluent;
4. During construction in a confined space, good ventilation must be maintained;
5. When using this product, you must wear work clothes, goggles, gas masks, gloves, and other protective equipment.
 
Product application guidance:
Recommended spraying machine: Gra co H-XP3 polyurea spraying equipment spray gun; air or mechanical self-cleaning polyurea spray gun
Static pressure 2300-2500psi; dynamic pressure 2000-2200psi
Recommended dry film thickness: 1000-3000μm
Recoating interval6h

 
Proportion: Component A: Component B =1:1


Packaging  and Shipping
Floor Ground Coating Spray Polyurea Spua Impact Resistance Coating

Company Information
Yulin Taylor Machinery Co., Ltd. is Located in Yulin city, Guangxi Province, China. We are a manufacturer and exporter, specializing in the research, development, and production of spray polyurea coating materials. Our main products: Polyurethane Machine, two Component Spray coating, and SprayPolyurea Coating materials, etc. 
Floor Ground Coating Spray Polyurea Spua Impact Resistance CoatingSpray Polyurea Coating Prices Anticorrosion Polyurea Waterproofing
FAQ
1. What is the price for polyurea materials?
The price is decided by Quantity.
 
2. How about samples?
Sample Lead Time: 5 working days
Sample Fee:
1). It's free for all for a regular customer

2). For new customers, we will charge first, it is fully refundable when the order is confirmed.
 
3. How many days for shipping?
Shipping Methods and Lead Time:
By Express: 3-5 working days to your door (DHL, UPS, TNT, FedEx...)
By Air: 5-8 working days to your airport
By Sea: Pls advise your port of destination, the exact days will be confirmed by our forwarders,  and the following lead time is for your reference. Europe and America (25 - 35 days), Asia (3-7 days), Australia ( 16-23 days)
 

4. What are the Terms of Payment?
Credit Card, T/T, L/C, Western Union;  30% T/T in advance, 70% before delivery.

5. Packaging & Shipping?
Pallet, wooden case or with outer carton, or as customers' specific requirements.


6. Why choose your company?
We are focusing on all aspects of anticorrosive waterproof, insulation fields. US technology and made in China, high quality and nice prices.
We strictly implement the rules according to the quality standard in every aspect from the purchase of raw materials to the production process and outgoing of products.

Great service and Superior quality is provided all the time…
Packaging & Shipping Packing: Carton, wooden box, and pallet, or as per customers' requirements.
Shipping: By Express (DHL /UPS /TNT /FedEx /EMS), By Air, By Sea.

Spray Polyurea Coating Prices Anticorrosion Polyurea Waterproofing

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier