Customization: | Available |
---|---|
Certification: | ISO, MSDS, ISO14001, ISO9001 |
Material: | Acrylic |
Still deciding? Get samples of US$ 5/kg
Request Sample
|
Suppliers with verified business licenses
Item | Technical Index | ||
JC/T 2252-2014 (primer coating) | TH-501H | ||
Viscosity (mPa.s) | component A | 40±10% | 40 |
component B | 25±10% | 25 | |
Surface drying time (h) | ≤4 | 1 | |
Hard working time (h) | ≤24 | 8 | |
Solid content (%) | ≥40 | 55 | |
Bond strength (MPa) | Dry base surface (MPa) | ≥2.5 | 10 |
Retention rate after immersion (%) | ≥70 | 85 | |
Peel strength (N/mm) | Dry base surface (N/mm) | ≥6.0 | 7.5 |
Retention rate after heat aging (%) | ≥70 | 80 | |
Retention rate after freeze-thaw cycle (%) | ≥70 | 80 |
The versatility of spray polyurea products |
Product shelf life and storage: 1. The storage temperature should be 5-40ºC 2. Under normal storage and transportation conditions, the storage period is not less than 6 months from the date of production 3. Store in a cool, ventilated environment, avoid direct sunlight, prohibit close to fire sources, and prevent collisions 4. Packaging: component A: 220KG/drum, component B: 210KG/drum |
Precautions: 1. During construction, the temperature of the substrate must be 3°C higher than the dew point temperature; 2. Before the product is used, component B should be fully stirred; 3. The system has a 100% solid content, and it is strictly forbidden to add any diluent; 4. During construction in a confined space, good ventilation must be maintained; 5. When using this product, you must wear work clothes, goggles, gas masks, gloves and other protective equipment. |
Product application guidance: Recommended spraying machine: Graco H-XP3 polyurea spraying equipment spray gun; air or mechanical self-cleaning polyurea spray gun Static pressure 2300-2500psi; dynamic pressure 2000-2200psi Recommended dry film thickness: 1000-3000μm Recoating interval≤6h |
Proportion: Component A: Component B =1:1 |